We do not sell all of the projects we develop. Increasingly, we hold projects in our own portfolio and operate them ourselves. The plans are to expand the portfolio of internally operated projects to up to 500 MW by the end of 2023. These projects reliably produce green electricity at various locations and generate sustainable, continuous income. This also includes wind farms that are intended for repowering.
Sum: 134.85 MW
Wind farms Kührstedt-Alfstedt |
---|
Nominal output: 43.2 MW |
Turbine manufacturer: Senvion / Siemens |
Turbine Type: 3,2M114 / SWT-3.2-113 |
Number of turbines: 13 |
The "Kührstadt-Alfstedt" wind farms are locted in Lower Saxony near Bad Bederkesa. The project received planning permission pursuant to the Federal Emission Control Act (BlmSchG) in 2016 and was commissioned in the fourth quarter of 2017.lfstedt" in Lower Saxony with 43.2 MW is in operation since end of 2016. |
Wind farm Gerdau-Repowering |
---|
Nominal output: 21.6 MW |
Turbine manufacturer: Nordex |
Turbine Type: N131 |
Number of turbines: 6 |
At the wind farm in Lower Saxony, six Nordex N131 systems, each with 3.6 MW nominal capacity and a hub height of 99 metres, have been set up. These will replace 13 wind energy turbines, which had been erected from 2001 in this wind farm by the PNE Group. The future average annual power production will be able to cover the power demand of more than 13,500 households. |
Wind farm Schlenzer |
---|
Nominal output: 6.5 MW |
Turbine manufacturer: GE Renewable Energy |
Turbine Type: GE 3.2-130 |
Number of turbines: 2 |
The "Schlenzer" wind farm is located in Brandenburg and covers the electricity needs of more than 5,800 3-4 person households with two GE 3.2-130 wind turbines. |
Wind farm Kittlitz III |
---|
Nominal output: 17.25 MW |
Turbine manufacturer: Vestas |
Turbine Type: V126 / V136 |
Number of turbines: 5 |
Three Vestas V126 and two Vestas V136 turbines were installed at the "Kittlitz III" wind farm. With different hub heights, they reach a total height of almost 200 metres. The wind farm is located in Brandenburg |
Wind farm Neuenwalde |
---|
Nominal output: 7.2 MW |
Turbine manufacturer: Nordex |
Turbine Type: N117 |
Number of turbines: 2 |
At the "Neuenwalde" wind farm in the district of Cuxhaven (Lower Saxony), two Nordex N117 wind turbines with a total height of approx. 149 metres were erected within a short time. The turbines have a total nominal capacity of 7.2 MW. |